Chargeman in a white hard hat, safety glasses and hi-vis vest checking breakers inside a low voltage switchboard at a Malaysian plant, holding a tablet
Penjaga Jentera Elektrik (Chargeman), A0 and A1

Chargeman Exam Practice Test: Penjaga Jentera Elektrik A0 and A1

Practise in the real format. Walk in ready.

Original theory questions based on the Electricity Supply Act 1990, the Electricity Regulations 1994 and the Suruhanjaya Tenaga chargeman syllabus, with an explanation for every answer. Try 5 questions free, no sign-up.

14-day money-back guarantee. Not happy for any reason? Full refund.

Free test → pay RM23 → instant access + emailed link

  • No login needed
  • 14-day money-back guarantee
  • Built from the official syllabus and sources
5 free questions, no login14-day money-back guaranteeOne payment, no subscription

Free test: 5 questions

Here are 5 free questions from different topics. Pick an answer to see the explanation.

Chargeman (PJE): free practice test

5 free questions. No login required.

  • 5 questions
  • About 8 min
  • Instant feedback
  • Free test

Tap an answer to see straight away if it is right, with a full explanation. Your scores are saved on this device only.

Full access RM23

14-day money-back guarantee. Not happy for any reason? Full refund.

Full pack: what you get
  • Electricity Laws and Regulations: 18 questions
  • Safety, First Aid and Safe Work Procedures: 15 questions
  • Basic Electrical Principles and Power Factor: 16 questions
  • Main Switchboard, Protection and Metering: 16 questions
  • Transformers and Cables: 15 questions
  • Motors, Starters, Batteries and Lighting: 17 questions
  • Earthing, Testing and Instruments: 15 questions
  • Overhead Lines (A1) and Energy Efficiency: 14 questions

126 questions in total · practise section by section · 30 days of access

Full access RM23

What is the Chargeman exam?

A Chargeman (Penjaga Jentera Elektrik, PJE) is the competent person who operates and looks after an electrical installation. The certificate of competency is issued by Suruhanjaya Tenaga (the Energy Commission) under the Electricity Supply Act 1990 and regulation 49 of the Electricity Regulations 1994. Restriction A0 covers low voltage systems without a power station or overhead lines; A1 adds low voltage overhead lines. Since 2013, A0 and A1 examinations are run through institutions accredited by the Energy Commission.

The exam and eligibility

Certified bySuruhanjaya Tenaga (Energy Commission)
Exam partsTeori (written theory), Amali (practical) and Lisan (oral). You must pass all three. A failed theory part blocks the practical and oral; a failed practical or oral part can be repeated.
Theory formatWritten answers to the questions set (regulation 49(3)). The number of questions, time allowed, pass mark and objective and subjective split are not published by the Energy Commission and may vary by accredited institution.
EligibilityMalaysian citizen, at least 20 years old, completed Form 5 (SVM considered with a transcript), at least 3 years' experience controlling live equipment, able to speak and write Bahasa Malaysia, and knowledge of first aid and of the Act and Regulations
Shorter routeHolders of a Wireman (Pendawai) certificate or a polytechnic electrical engineering certificate need 2 years' experience instead of 3
A11 year of low voltage overhead line experience or a certified TAVR module at an accredited institution, plus 1 year registered as PJE A0
FeesRM20 application processing fee plus RM110 examination fee (Energy Commission). Accredited institutions charge their own course fees.

What this pack covers

This pack covers the written theory part only. The practical (Amali) and oral (Lisan) parts cannot be practised as written multiple choice, so they are not included.

  • Laws and regulations: the Electricity Supply Act 1990, the Electricity Regulations 1994, voltage definitions and the duties of a competent person.
  • Safety and first aid: safe work procedures, isolation, permits, electric shock and CPR.
  • Electrical principles: Ohm's law, power, three-phase systems and power factor correction.
  • Main switchboard: circuit breakers, protection relays, earth leakage protection and metering.
  • Transformers and cables: losses, ratings, cable selection and installation.
  • Motors, batteries and lighting: starters, motor protection, batteries and lighting systems.
  • Earthing and testing: earth electrodes, earth fault loop impedance, insulation resistance and instruments.
  • Overhead lines (A1): low voltage overhead lines, stays and clearances.

Free official resources, and what we add

The Energy Commission publishes the Penjaga Jentera Elektrik conditions and syllabus, and the Electricity Regulations 1994 are publicly available. There is no official question bank. Our questions are original, and every explanation says why the answer is right.

How to prepare

  1. Read regulation 49 and the voltage definitions in regulation 2 of the Electricity Regulations 1994 until you know them by heart.
  2. Learn the Malaysian low voltage supply: 230/400 V, 50 Hz, with tolerances of +10% and -6% since 2008.
  3. Practise power, current and power factor calculations by hand, including three-phase working.
  4. Know what each device on a main switchboard does, from the incoming breaker to the earth leakage relay and the maximum demand meter.
  5. Learn the test sequence for a new installation and what each instrument measures.
  6. Practise one topic at a time here, then sit full timed mocks.

Practice questions with answers

Tap a question to see the correct answer and explanation.

Under regulation 2 of the Electricity Regulations 1994, what is the upper limit of 'extra low voltage'?
  1. 30 V a.c. or 60 V d.c.
  2. 110 V a.c. or 150 V d.c.
  3. 240 V a.c. or 240 V d.c.
  4. 50 V a.c. or 120 V d.c.

Answer: D, 50 V a.c. or 120 V d.c.. Regulation 2 defines extra low voltage as a voltage normally not exceeding 50 volts a.c. or 120 volts d.c., between conductors or between conductor and earth.

Before work begins on a low voltage main switchboard, what does regulation 20 of the Electricity Regulations 1994 require?
  1. The supply must be reduced to half voltage
  2. The switchboard, or the section to be worked on, must be made dead and the conductors earthed
  3. Only the outgoing MCCBs need to be switched off, while the incomer and busbars stay live
  4. A fire extinguisher must be placed beside the board

Answer: B, The switchboard, or the section to be worked on, must be made dead and the conductors earthed. Regulation 20 requires the switchboard to be made dead and the conductor earthed, or, where it is sectionalised with screens, the section to be worked on made dead and every conductor earthed.

A heater of resistance 46 ohms is connected to 230 V. What current flows?
  1. 0.2 A
  2. 10.6 A
  3. 5 A
  4. 4.6 A

Answer: C, 5 A. By Ohm's law, I = V / R = 230 / 46 = 5 A.

Get the full Chargeman practice pack

Unlock all 126 theory questions, timed mock exams, practice by topic and an explanation for every answer. Works on your phone, with 30 days of access.

Questions and answers

Who issues the Chargeman certificate?

Suruhanjaya Tenaga (the Energy Commission) issues the Penjaga Jentera Elektrik certificate of competency under the Electricity Supply Act 1990 and regulation 49 of the Electricity Regulations 1994. Since 2013, A0 and A1 examinations are run through institutions the Energy Commission accredits.

What is the difference between A0 and A1?

A0 covers low voltage systems without a power station or overhead lines. A1 covers low voltage systems without a power station, including low voltage overhead lines. A1 needs overhead line experience or a certified TAVR module, plus 1 year registered as PJE A0.

What do I need to sit the exam?

You must be a Malaysian citizen aged at least 20, have completed Form 5, have at least 3 years' experience controlling live equipment (2 years for Wireman certificate or polytechnic electrical certificate holders), speak and write Bahasa Malaysia, and know first aid and the Act and Regulations.

How many questions are in the theory paper, and what is the pass mark?

The Energy Commission does not publish the number of questions, the time allowed or the pass mark, and they may vary by accredited institution. You must pass the theory, practical and oral parts. Our mocks use our own format of 40 questions in 60 minutes.

Does this pack cover the practical and oral parts?

No. It covers the written theory part only. The practical and oral parts are done in person and cannot be practised as multiple choice questions.

Are these real Chargeman exam questions?

No. They are original questions written and checked against the Electricity Supply Act 1990, the Electricity Regulations 1994 and the Energy Commission syllabus. TestReady MY is independent and is not affiliated with or endorsed by Suruhanjaya Tenaga or any accredited institution.

Other practice tests

Sources (checked 30 October 2026): Suruhanjaya Tenaga, Penjaga Jentera Elektrik conditions and syllabus · Suruhanjaya Tenaga, Register as a competent person: Chargeman · Suruhanjaya Tenaga, Information notice on competency examinations · Suruhanjaya Tenaga, Single-phase and three-phase equipment · Energy Commission of Sabah, Penjaga Jentera Elektrik conditions and syllabus

Checked against the Electricity Supply Act 1990 (Act 447), the Electricity Regulations 1994 (including regulation 49), the Suruhanjaya Tenaga Penjaga Jentera Elektrik conditions and syllabus, and MS IEC 60038. Last reviewed: October 2026.